We are happy to announce a Liquidation Sale! Your chance to own a good placer claim!


We have a major breakthrough in one of our projects. As a result, we are focusing ALL our effort on it and selling ALL our placer claims for pennies on a dollar.
Gold can be easily panned on every claim we are selling. We are quite confident that our claims have a potential to become producing placer mines as some of them were in the past.

Please be advised that thorough mechanical testing will be required to evaluate economic value of the claims. We are selling them for pennies on a dollar we spent, because there is no reliable means to estimate their true value before mechanical testing takes place.

Click on claim names below to learn more about them:
Cariboo River      Umiti Creek      Gun Creek .



About Us

Deep Valley Gold Inc. (DVG) is a private mineral exploration company that focuses on high grade low tonnage placer projects with low mining costs and potentially high profit margins. The company was formed in 2010 after two years of placer research and field studies with the main goal of generating a constant pipeline of quality placer projects suitable for rapid development mining operations.



Placer Mining Costs Calculator

All-inclusive mining costs in the table below were calculated using a comprehensive SHERPA for Placer Mines.
Even though the costs were estimated based on property specific criteria and included mob-demob, camp facilities, development, mining and reclamation, they are provided for general guidelines only.

If you would like to get an accurate mining costs estimation, we suggest you to use SHERPA Software and provide your own values for administrative, engineering and labour costs, placer deposit and mine site specific parameters, mining, processing and ancillary equipment along with other parameters related to your planned placer operation.

Feel free to modify production capacity and grade in the mini-calculator below and review mining costs
per gold ounce.
Project Avg. Grade
(projected 4 ), g/m3
Production Capacity:       187 m3/day                   375 m3/day                   750 m3/day
Mining Costs, $/m3 Mining Costs, $/oz Production Rate, oz/day  
 Umiti Creek
 John Boyd Creek
 Gun Creek


Comparing to Hard-rock and Evaluating Risks

The calculator below is provided for evaluating investments risks and potential revenue based on gold spot price, projected gold grade, deposit size and mining costs.
Deposit size estimation is offered by assuming reserves sufficient to keep busy a small crew with a single washing plant during a mining season.
Mining Costs per gold ounce is calculated using SHERPA for Placer Mines.
Revenue is calculated based on mining costs minus royalty paid to property owner.

The calculator is not intended to give an accurate estimation that would depend on many specific criteria (e.g. confirmed deposit parameters, selected equipment, mining plan, etc...). However, it allows to evaluate projected revenue by modifying input parameters and compare placer targets with modern hard-rock mining operations.

Feel free to provide your own input parameters and re-evaluate project potential: 1 Day Spot Gold Prices - Gold Price Chart
  Spot Price: , $/oz  Placer Mining Season: , days  Royalty: , %
  Production Capacity: 187 m3/day 375 m3/day  
  Production Expectations: 1 crew, low grade 2 crews, OK grade 3 crews, good grade
 
Project Working Crews Grade, g/m3 Mining Costs, $/oz Revenue, $/oz Annual Production
(projected), oz
Annual Revenue
(projected), $
 Umiti Creek          
 John Boyd Creek
 Gun Creek




Our Cariboo neighbours

Over the last few years more companies, attracted by high grade deposits, became involved in placer activities in the Cariboo:

Company Project Grade, g/m3 Source
Omineca Mining and Metals Ltd. (OMM:TSX-V) Wingdam 34.55 5  NI 43-101 Report, pages 45,87


1  Forward-Looking Statements. This web page contains certain "forward-looking" statements and information relating to DVG that are based on the beliefs    of DVG management, as well as assumptions made by and information currently available to DVG management. Such statements reflect the current risks,    uncertainties and assumptions related to certain factors including but not limited to, exploration risks and results, metal prices and general economic    conditions. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and    forward-looking statements may vary materially from those described herein. DVG does not assume the obligation to update any forward-looking statement.

2  Estimated using SHERPA Software for Placer Mines. At this stage of exploration, the estimation can be used as a general guideline only.

3  Detour Gold. News Release, Jan. 16, 2018 (p. 1, 2).

4 Depending on the project, the projected average grade is expected to be higher, similar or lower than the grade returned by hand sampling.
   Please see project descriptions for gold grade, returned by hand sampling.

5 34.55 g/m3 is an average gold grade across the buried stream channel. Some samples returned grades over 71.35 g/m3.